When data is collected from a SKF Microlog Analyzer that is set to the wrong date, the data will reflect the incorrect date in SKF @ptitude Analyst. Currently in @ptitude Analyst, the ONLY way to change the dates in the software is one POINT at a time, by going to the Properties of the Measurement, then adjusting the Date/Time accordingly. This becomes an issue when there are several hundred measurements which are incorrect. This article describes a procedure to fix the dates for multiple measurements at once using SQL Server Management Studio.
Comments
0 comments
Please sign in to leave a comment.